Mine Plant Electrical Upgrade
Electrical

Mine Plant Electrical Upgrade

LV/MV switchgear replacement and MCC upgrade for an active mining operation.

Erongo Region2024
Fish Processing Facility Maintenance
Industrial

Fish Processing Facility Maintenance

12-month preventative maintenance contract across refrigeration and process plant.

Walvis Bay2024
Commercial Office Build
Construction

Commercial Office Build

Turnkey construction of a 1,200 m² commercial office building.

Windhoek2023
Off-Grid Solar Installation
Power

Off-Grid Solar Installation

Hybrid solar-battery system for a remote lodge, replacing diesel-only supply.

Kunene Region2024
Plant Reliability Program
Industrial

Plant Reliability Program

Scheduled preventative maintenance and conveyor-system upgrades for a manufacturing facility.

Central Namibia2023
Mine Site Infrastructure Support
Construction

Mine Site Infrastructure Support

Multi-trade coordination on mining infrastructure upgrades and civil support works.

Erongo Region2024
Case Study

Mine Plant Electrical Upgrade, Erongo Region

01

Challenge

An aging LV/MV switchgear installation was causing repeated unplanned outages on a producing mining operation, with each hour of downtime carrying significant cost.

02

Approach

LuderiX developed a phased replacement plan aligned to the client's maintenance windows, with pre-fabricated panels commissioned off-site to minimise on-site tie-in time.

03

Outcome

Full upgrade completed within the planned outage windows, zero safety incidents, and a documented drop in electrical-related unplanned downtime post-commissioning.

Client Success Stories

What clients say about working with us.

"

LuderiX delivered our plant shutdown on schedule and under budget. Their site discipline and communication were exceptional.

Operations Manager
Mining Sector
"

We've used LuderiX for three refurbishment cycles now. They understand our operating hours and work around them without drama.

Facilities Director
Retail Group
"

The team's technical depth on the switchgear upgrade saved us from a much longer outage than we'd budgeted for.

Plant Engineer
Manufacturing
"

LuderiX delivered our plant shutdown on schedule and under budget. Their site discipline and communication were exceptional.

Operations Manager
Mining Sector
"

We've used LuderiX for three refurbishment cycles now. They understand our operating hours and work around them without drama.

Facilities Director
Retail Group
"

The team's technical depth on the switchgear upgrade saved us from a much longer outage than we'd budgeted for.

Plant Engineer
Manufacturing
"

LuderiX delivered our plant shutdown on schedule and under budget. Their site discipline and communication were exceptional.

Operations Manager
Mining Sector
"

We've used LuderiX for three refurbishment cycles now. They understand our operating hours and work around them without drama.

Facilities Director
Retail Group
"

The team's technical depth on the switchgear upgrade saved us from a much longer outage than we'd budgeted for.

Plant Engineer
Manufacturing
"

LuderiX delivered our plant shutdown on schedule and under budget. Their site discipline and communication were exceptional.

Operations Manager
Mining Sector
"

We've used LuderiX for three refurbishment cycles now. They understand our operating hours and work around them without drama.

Facilities Director
Retail Group
"

The team's technical depth on the switchgear upgrade saved us from a much longer outage than we'd budgeted for.

Plant Engineer
Manufacturing

Have a project in mind?